/* */

News: Redbridge Cycling Centre during Olympics

Details on using the Redbridge Cycling Centre during the Olympics and Paralympics – July to September

RST Cycle Clothing & Trigon Bikes

Redbridge Cycling Centre is pleased to announce that it will be used as a games time training venue for cycling during the London 2012 Olympics and Paralympics. The Centre however will not be closed exclusively from July through to September. The Centre will only be closed daytimes until 15:00 from the 15th of July through to the 13th of August (for the Olympics), and until 13:00 from the 20th of August to the 10th September (for the Paralympics).

Outside of these times, the Centre will be open to the public and and while there will be limited facilities available within the building (e.g. no clubroom), all the tracks will be open allowing casual use, races and events to go ahead as normal in the afternoon and evenings.

Redbridge Cycling Centre is different to other training venues in that it has a contract with LOCOG in that it states it is not closed exclusively and can open to the public outside of times agreed with LOCOG. Of the 25 games time training venues RCC is the only one that has been allowed to be open to the public in the evenings.

If you have any queries regarding the closure of RCC then please do not hesitate to contact us on 0208 5009359 or check our website www.hoghill.co.uk

 

 

 

RST Cycle Clothing & Trigon Bikes


Other Results on VeloUK (including reports containing results)


Other News on VeloUK

Tags: News

WordPress SEO fine-tune by Meta SEO Pack from Poradnik Webmastera